
Project Introduction: This project has an installed capacity of 1 million kilowatts (of which 900,000 kilowatts is wind power and 100,000 kilowatts is photovoltaic power), and is equipped with an 80 MW/320 MWh energy storage system. Once the project reaches full capacity and begins operation, it is expected to generate approximately 24.29 billion kilowatt-hours of clean electricity annually—equivalent to saving 713,000 tons of standard coal and reducing carbon dioxide emissions by 1.942 million tons. This will effectively optimize the regional energy structure and help Xinjiang build itself into a major national clean energy base.